Ron Blevins
North Fork District. In the Board's minutes from June 12, 2012 to January 12, 2016.
- Votes cast by name
- 1,397
- Against
- 66
- 4.7% of votes
- Alone against
- 54
- Meetings attended
- 96%
- 80 of 83
- Motions made
- 320
Counted from roll calls that name each supervisor. The minutes spell this name as: Ron Blevins.
Year by year
Each chart has its own scale, from zero. The numbers are in the table below.
Voting with colleagues
On votes where the Board divided and both voted by name.
| Colleague | Same way | Divided votes together |
|---|---|---|
| Regina Davidson | 21% | 11 of 52 |
| Todd Dishner | 21% | 16 of 78 |
| Howard Burton | 19% | 15 of 77 |
| Rick Blevins | 19% | 14 of 73 |
| Wade Blevins | 16% | 12 of 77 |
| Roscoe Call | 15% | 12 of 80 |
| Blake Frazier | 0% | 0 of 24 |
Votes against and abstentions
The 60 most recent of 80. Names appear as the minutes spell them.
-
Appropriate $943,918.67 for the Courthouse Project
November 12, 2015 · Carried 5–1 · $943,919
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $943,918.67 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
- Absent
- Howard Burton
-
Appropriate $1,088,062.43 for the Courthouse Project
October 13, 2015 · Carried 5–1 · $1,088,062
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Rye Valley District Supervisor Rick K. Blevins to appropriate $1,088,062.43 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Rick Blevins
- Aye
- Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
- Absent
- Wade Blevins
-
Appropriate $615,566.84 for the Courthouse Project
September 8, 2015 · Carried 6–1 · $615,567
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $615,566.84 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $826,568.20 for the Courthouse Project
July 14, 2015 · Carried 4–1 · $826,568
It was moved by Atkins District Supervisor J. Howard Burton seconded by Rye Valley District Supervisor Rick K. Blevins to appropriate $826,568.20 for the Courthouse Project.
- Moved
- Howard Burton, seconded by Rick Blevins
- Aye
- Todd Dishner, Rick Blevins, Howard Burton, Blake Frazier
- Nay
- Ron Blevins
- Absent
- Wade Blevins, Roscoe Call
-
Appropriate $1,027,143.62 for the Courthouse Project
June 9, 2015 · Carried 6–1 · $1,027,144
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $1,027,143.62 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $652,067.96 for the Courthouse Project
May 12, 2015 · Carried 6–1 · $652,068
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $652,067.96 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $675,585.31 for the Courthouse Project
April 14, 2015 · Carried 6–1 · $675,585
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $675,585.31 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $960.36 from Sheriff Fund-748 for outstanding invoices
March 10, 2015 · Carried 6–1 · $960
It was moved by Atkins District Supervisor J. Howard Burton seconded by Park District Supervisor M. Todd Dishner to appropriate $960.36 from Sheriff Fund-748 for outstanding invoices.
- Moved
- Howard Burton, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $400,955.69 for the Courthouse Project
March 10, 2015 · Carried 6–1 · $400,956
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $400,955.69 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Adopt the following Resolution certifying the business conducted in Closed session as follows: RESOLUTION…
March 10, 2015 · Carried 6–0
It was moved by Rye Valley District Supervisor Rick K. Blevins, seconded by Saltville District Supervisor Roscoe D. Call to adopt the following Resolution certifying the business conducted in Closed session as follows: RESOLUTION CERTIFICATION OF CLOSED SESSION WHEREAS, the Smyth County Board of Supervisors has convened in a closed session on this date pursuant to an affirmative recorded vote and in accordance with the provisions of the Virginia Freedom of Information Act; and WHEREAS, Section 2.2-3712 of the Code of Virginia requires a certification by the Smyth County Board of Supervisors th…
- Moved
- Rick Blevins, seconded by Roscoe Call
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Abstained
- Ron Blevins
-
Appropriate $332,447.45 for the Courthouse Project
February 10, 2015 · Carried 6–1 · $332,447
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $332,447.45 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $786,720.07 for the Courthouse Project
January 13, 2015 · Carried 6–1 · $786,720
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Royal Oak District Supervisor G. Blake Frazier to appropriate $786,720.07 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Blake Frazier
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Accept this change order from BurWil Construction
December 9, 2014 · Carried 6–1 · The Board's vote on a committee's recommendation. The motion quoted is the committee's. · $55,801
Royal Oak District Supervisor G. Blake Frazier brought a recommendation before the Board from the Courthouse Committee. Mr. Frazier stated the committee met on December 2, 2014 concerning a change order on the Courthouse Project from BurWil Construction in the amount of $55,800.91. It is the committee’s recommendation to accept this change order from BurWil Construction.
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $663,997.61for the Courthouse Project
December 9, 2014 · Carried 6–1 · $663,998
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Royal Oak District Supervisor G. Blake Frazier to appropriate $663,997.61for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Blake Frazier
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $353,132.65 for the Courthouse Project
November 12, 2014 · Carried 6–1 · $353,133
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Royal Oak District Supervisor G. Blake Frazier to appropriate $353,132.65 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Blake Frazier
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $229,558.06 for the Courthouse Project
October 14, 2014 · Carried 4–1 · $229,558
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Rye Valley District Supervisor Rick K. Blevins to appropriate $229,558.06 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Rick Blevins
- Aye
- Todd Dishner, Rick Blevins, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
- Absent
- Wade Blevins, Howard Burton
-
Appropriate $312,856.26 for the Courthouse Project
September 9, 2014 · Carried 6–1 · $312,856
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $312,856.26 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $276,745.62 for the Courthouse Project
August 12, 2014 · Carried 6–1 · $276,746
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Royal Oak District Supervisor G. Blake Frazier to appropriate $276,745.62 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Blake Frazier
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $211,787.80 for the Courthouse Project
July 8, 2014 · Carried 6–1 · $211,788
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $211,787.80 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Appropriate $249,616.12 for the Courthouse Project
June 10, 2014 · Carried 5–1 · $249,616
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $249,616.12 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
- Absent
- Howard Burton
-
Appropriate $12,210.76 for the Courthouse Project
May 13, 2014 · Carried 6–1 · $12,211
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Park District Supervisor M. Todd Dishner to appropriate $12,210.76 for the Courthouse Project.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Approve the recommendation as presented by the Planning Commission
April 8, 2014 · Failed 2–4
Rye Valley District Supervisor Rick K. Blevins made a motion to approve the recommendation as presented by the Planning Commission. Saltville District Supervisor Roscoe D. Call seconded the motion.
- Moved
- Rick Blevins, seconded by Roscoe Call
- Aye
- Wade Blevins, Roscoe Call
- Nay
- Todd Dishner, Rick Blevins, Ron Blevins, Howard Burton
- Absent
- Blake Frazier
-
Allow The Lincoln Theatre to start the application process for grant monies
March 27, 2014 · Failed 3–4
Royal Oak District Supervisor, G. Blake Frazier made a motion to allow The Lincoln Theatre to start the application process for grant monies. Saltville District Supervisor, Roscoe D. Call seconded the motion.
- Moved
- Blake Frazier, seconded by Roscoe Call
- Aye
- Wade Blevins, Roscoe Call, Blake Frazier
- Nay
- Todd Dishner, Rick Blevins, Ron Blevins, Howard Burton
-
For the execution of contracts for Courthouse Renovation and permission for the Chairman to sign
March 27, 2014 · Carried 6–1
Royal Oak District Supervisor G. Blake Frazier made a motion for the execution of contracts for Courthouse Renovation and permission for the Chairman to sign. Park District Supervisor M. Todd Dishner seconded the motion.
- Moved
- Blake Frazier, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
To award the Courthouse bid to Burwil Construction, at a base bid of $13,578,000.00. 2.) A recommendation to…
March 11, 2014 · Carried 6–1 · The Board's vote on a committee's recommendation. The motion quoted is the committee's. · $13,578,000, $218,000, $13,796,000
Scott Simpson, Assistant County Attorney brought before the Board a recommendation from the Courthouse Committee concerning the following: 1.) A recommendation to the Board to award the Courthouse bid to Burwil Construction, at a base bid of $13,578,000.00. 2.) A recommendation to the Board for bid alternate No.1B and alternate NO.3, for a total bid alternate of $218,000.00. With this alternate bid, it also allows for the dome on the courthouse to be addressed, along with the roof of the Court House. This would make total contract to Burwil Construction $13,796,000.00.
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins
-
Accept the resolution and authorize, Chairman, Chilhowie District Supervisor Wade H. Blevins Jr, to sign the…
March 11, 2014 · Carried 5–2
Royal Oak District Supervisor G. Blake Frazier made a motion to accept the resolution and authorize, Chairman, Chilhowie District Supervisor Wade H. Blevins Jr, to sign the Resolution. Saltville District Supervisor Roscoe D. Call seconded the motion.
- Moved
- Blake Frazier, seconded by Roscoe Call
- Aye
- Wade Blevins, Todd Dishner, Howard Burton, Roscoe Call, Blake Frazier
- Nay
- Ron Blevins, Rick Blevins
-
Appropriate $449,241.70 for the Accounts Payable listing
March 11, 2014 · Carried 6–0 · $449,242
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Royal Oak District Supervisor G. Blake Frazier to appropriate $449,241.70 for the Accounts Payable listing.
- Moved
- Roscoe Call, seconded by Blake Frazier
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Abstained
- Ron Blevins
-
Appropriate $14,435.71 for the Lick Skillet Housing Project
March 11, 2014 · Carried 6–0 · $14,436
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Rye Valley District Supervisor Rick K. Blevins to appropriate $14,435.71 for the Lick Skillet Housing Project.
- Moved
- Roscoe Call, seconded by Rick Blevins
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Abstained
- Ron Blevins
-
Appropriate $6,427.82 for the EDA-Fund
March 11, 2014 · Carried 6–0 · $6,428
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Rye Valley District Supervisor Rick K. Blevins to appropriate $6,427.82 for the EDA-Fund.
- Moved
- Roscoe Call, seconded by Rick Blevins
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Abstained
- Ron Blevins
-
Appropriate $205.00 for the Animal Damage Fund
March 11, 2014 · Carried 6–0 · $205
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Royal Oak District Supervisor G. Blake Frazier to appropriate $205.00 for the Animal Damage Fund.
- Moved
- Roscoe Call, seconded by Blake Frazier
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Abstained
- Ron Blevins
-
Appropriate $5,275,000.00 for the General Fund appropriation
March 11, 2014 · Carried 6–0 · $5,275,000, $1,340,000, $325,000
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Royal Oak District Supervisor G. Blake Frazier to appropriate $5,275,000.00 for the General Fund appropriation. The following is an explanation of the appropriations approved: General County $ 1,340,000.00 Social Services (March 12-31, 2014) $ 325,000.00 (April 1-8, 2014) $ 60,000.00 Schools - Operating Fund $ 3,500,000.00 School Debt and Capital Outlay Fund $ 50,000.00
- Moved
- Roscoe Call, seconded by Blake Frazier
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Blake Frazier
- Abstained
- Ron Blevins
-
Approve $59,918.68 for the Courthouse Project appropriation
January 14, 2014 · Carried 6–1 · $59,919
It was moved by Saltville District Supervisor Roscoe D. Call seconded by Vice Chair, Park District Supervisor M. Todd Dishner to approve $59,918.68 for the Courthouse Project appropriation.
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Approve $1750.00 for the Animal Damage Fund
January 14, 2014 · Carried 6–1 · $1,750
It was moved by Vice Chair, Park District Supervisor M. Todd Dishner seconded by Rye Valley District Supervisor Rick K. Blevins to approve $1750.00 for the Animal Damage Fund.
- Moved
- Todd Dishner, seconded by Rick Blevins
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Approve $ 62,365.12 for the courthouse project appropriation
December 10, 2013 · Carried 6–1 · $62,365
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Park District Supervisor M. Todd Dishner, to approve $ 62,365.12 for the courthouse project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Approve $ 41,661.35 for the courthouse project appropriation
November 13, 2013 · Carried 6–1 · $41,661
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Park District Supervisor M. Todd Dishner, to approve $ 41,661.35 for the courthouse project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Approve the refund
October 8, 2013 · Carried 6–1
Saltville District Supervisor Roscoe D. Call made a motion to approve the refund. Atkins District Supervisor J. Howard Burton seconded the motion. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Howard Burton
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Approve $4,485.60 for the courthouse project appropriation
October 8, 2013 · Carried 6–1 · $4,486
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Royal Oak District Supervisor Regina H. Davidson, to approve $4,485.60 for the courthouse project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Regina Davidson
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Approve $2,256,150 for the General Fund appropriation
October 8, 2013 · Carried 6–1 · $2,256,150, $410,000, $1,346,150
A motion was made by Saltville District Supervisor Roscoe D. Call, seconded by Rye Valley District Supervisor Rick K. Blevins, to approve $2,256,150 for the General Fund appropriation. The following is an explanation of the appropriations approved: General County $410,000.00 Courthouse Debt Service $1,346,150.00 Schools – Operating Fund $300,000.00 School Debt and Capital Outlay Fund $200,000.00 Total General Fund $2,256,150.00 After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Rick Blevins
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
The Courthouse Committee also made a unanimous recommendation authorizing signature on the required…
September 26, 2013 · Carried 5–1
The Courthouse Committee also made a unanimous recommendation authorizing signature on the required documents allowing the next phase of the project to go out for bid. After consideration, the motion PREVAILED by the following vote:
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call
- Nay
- Ron Blevins
- Absent
- Regina Davidson
-
The construction schedule changes discussed and to authorize signature on the required documents for the…
September 26, 2013 · Carried 5–1
Chairman Blevins reported the Courthouse Committee met recently with Moseley Architects to discuss the next phase of the Courthouse project. Mr. Simpson reported the jail has been torn down and the first phase of construction and site preparation is wrapping up and will soon be ready to bid on the second phase. Mr. Simpson reviewed the budget and provided an overview of the next phases of construction for the project. There was also discussion in the committee meeting about the frequency of site visits by Moseley during the construction process. The committee is unanimously recommending the Bo…
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call
- Nay
- Ron Blevins
- Absent
- Regina Davidson
-
Approve the Planning Commission recommendation on the special use permit
September 10, 2013 · Carried 5–0
A motion was made by Saltville District Supervisor Roscoe D. Call, seconded by Royal Oak District Supervisor Regina H. Davidson, to approve the Planning Commission recommendation on the special use permit. Atkins District Supervisor J. Howard Burton questioned the placement of fencing at the proposed daycare location and Mrs. Clayton answered it would be up to the state to determine the steps for licensing the daycare.
- Moved
- Roscoe Call, seconded by Regina Davidson
- Aye
- Wade Blevins, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Abstained
- Ron Blevins
- Absent
- Todd Dishner
-
Approve the Planning Commission recommendation on the map amendment
September 10, 2013 · Carried 5–0
Royal Oak District Supervisor Regina H. Davidson made a motion to approve the Planning Commission recommendation on the map amendment. Rye Valley District Supervisor Rick K. Blevins seconded the motion.
- Moved
- Regina Davidson, seconded by Rick Blevins
- Aye
- Wade Blevins, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Abstained
- Ron Blevins
- Absent
- Todd Dishner
-
Approve $69,225.85 for the courthouse project appropriation
September 10, 2013 · Carried 5–1 · $69,226
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Royal Oak District Supervisor Regina H. Davidson, to approve $69,225.85 for the courthouse project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Regina Davidson
- Aye
- Wade Blevins, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
- Absent
- Todd Dishner
-
Accept the Planning Commission recommendation on this special use permit
August 13, 2013 · Carried 6–0
Royal Oak District Supervisor Regina H. Davidson made a motion to accept the Planning Commission recommendation on this special use permit. Saltville District Supervisor Roscoe D. Call seconded the motion. North Fork District Supervisor Ron C. Blevins questioned whether the Planning Commission went through the proper checklist of discussion on this matter before making their recommendation. Mrs. Clayton stated the discussion held by the Planning Commission concerning the permit was sufficient to the code. She also noted there is a checklist being developed that will be put before the Planning …
- Moved
- Regina Davidson, seconded by Roscoe Call
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Abstained
- Ron Blevins
-
Approve $70,444.60 for the courthouse project appropriation
August 13, 2013 · Carried 6–1 · $70,445
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Vice Chair, Park District Supervisor M. Todd Dishner, to approve $70,444.60 for the courthouse project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Approve $139,534.85 for the Courthouse Project appropriation
July 9, 2013 · Carried 5–1 · $139,535
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Vice Chair, Park District Supervisor M. Todd Dishner, to approve $139,534.85 for the Courthouse Project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
- Absent
- Rick Blevins
-
The appointment committee unanimously recommends reappointing North Fork District Supervisor Ron C. Blevins…
June 11, 2013 · Carried 6–0
The appointment committee unanimously recommends reappointing North Fork District Supervisor Ron C. Blevins to serve on the Marion Downtown Revitalization Committee for a one-year term that expires June 30, 2014.
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Abstained
- Ron Blevins
-
Seconded by Rye Valley District Supervisor Rick K. Blevins, to accept the Planning Commission’s…
June 11, 2013 · Carried 6–0
Royal Oak District Supervisor Regina H. Davidson made a motion, seconded by Rye Valley District Supervisor Rick K. Blevins, to accept the Planning Commission’s recommendation including the restriction.
- Moved
- Regina Davidson, seconded by Rick Blevins
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Abstained
- Ron Blevins
-
Approve the Planning Commission recommendation
June 11, 2013 · Carried 6–0
Vice Chair, Park District Supervisor M. Todd Dishner made a motion to approve the Planning Commission recommendation. Atkins District Supervisor J. Howard Burton seconded the motion.
- Moved
- Todd Dishner, seconded by Howard Burton
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Abstained
- Ron Blevins
-
Approve $160,820.11 for the Courthouse Project appropriation
June 11, 2013 · Carried 6–1 · $160,820
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Vice Chair, Park District Supervisor M. Todd Dishner, to approve $160,820.11 for the Courthouse Project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Have CenturyLink reroute their cables at a cost not to exceed $44,332
May 14, 2013 · Carried 6–1 · $44,332
Royal Oak District Supervisor Regina H. Davidson made a motion to have CenturyLink reroute their cables at a cost not to exceed $44,332. Saltville District Supervisor Roscoe D. Call seconded the motion. After consideration, the motion PREVAILED by the following vote:
- Moved
- Regina Davidson, seconded by Roscoe Call
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Approve the PPEA/PPTA legislation
May 14, 2013 · Carried 5–2
Royal Oak District Supervisor Regina H. Davidson made a motion to approve the PPEA/PPTA legislation. Saltville District Supervisor Roscoe D. Call seconded the motion. After consideration, the motion PREVAILED by the following vote:
- Moved
- Regina Davidson, seconded by Roscoe Call
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins, Howard Burton
-
Approve $213,200.91 for the Courthouse Project appropriation
May 14, 2013 · Carried 5–1 · $213,201
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Atkins District Supervisor J. Howard Burton, to approve $213,200.91 for the Courthouse Project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Howard Burton
- Aye
- Wade Blevins, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
- Absent
- Todd Dishner
-
Approve $129,067.01 for the Courthouse Project appropriation
April 9, 2013 · Carried 6–1 · $129,067
It was moved by Royal Oak District Supervisor Regina H. Davidson, seconded by Rye Valley District Supervisor Rick K. Blevins, to approve $129,067.01 for the Courthouse Project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Regina Davidson, seconded by Rick Blevins
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Accept the contract pending legal negotiations
March 12, 2013 · Carried 6–1 · $300,000
Saltville District Supervisor Roscoe D. Call made a motion to accept the contract pending legal negotiations. Royal Oak District Supervisor Regina H. Davidson seconded the motion. Atkins District Supervisor J. Howard Burton asked if this went out for bid and Mr. Simpson stated it was procured under professional services and the Courthouse Committee selected ECS after presentations from two firms. Vice Chair, Park District Supervisor M. Todd Dishner asked if this will be done in different phases and Mr. Simpson answered yes, there are two phases of construction but another procurement process w…
- Moved
- Roscoe Call, seconded by Regina Davidson
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Hold a public hearing on the comprehensive plan at the April 9, 2013 Board of Supervisors meeting at 6:00 p.m
March 12, 2013 · Carried 6–1
Supervisor Roscoe D. Call made a motion to hold a public hearing on the comprehensive plan at the April 9, 2013 Board of Supervisors meeting at 6:00 p.m. Rye Valley District Supervisor Rick K. Blevins seconded the motion. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Rick Blevins
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Approve $102,838.05 for the Courthouse Project appropriation
March 12, 2013 · Carried 6–1 · $102,838
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Vice Chair, Park District Supervisor M. Todd Dishner, to approve $102,838.05 for the Courthouse Project appropriation. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Rick Blevins, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
-
Mr. Simpson reported the Courthouse Committee met last week to interview two material testing firms for the…
February 12, 2013 · Carried 5–1
Mr. Simpson reported the Courthouse Committee met last week to interview two material testing firms for the demolition phase of the Courthouse project. After evaluating the two presentations, the Committee unanimously recommends ECS Mid-Atlantic, LLC as their first choice to begin contract negotiations for this phase of the project. After consideration, the motion PREVAILED by the following vote:
- Aye
- Wade Blevins, Todd Dishner, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
- Absent
- Rick Blevins
-
Adopt the resolution
February 12, 2013 · Carried 5–0
Saltville District Supervisor Roscoe D. Call made a motion to adopt the resolution. Atkins District Supervisor J. Howard Burton seconded the motion.
- Moved
- Roscoe Call, seconded by Howard Burton
- Aye
- Wade Blevins, Todd Dishner, Howard Burton, Roscoe Call, Regina Davidson
- Abstained
- Ron Blevins
- Absent
- Rick Blevins
-
Approve $53,352.56 for the Courthouse Project
February 12, 2013 · Carried 5–1 · $53,353
It was moved by Saltville District Supervisor Roscoe D. Call, seconded by Vice Chair, Park District Supervisor M. Todd Dishner, to approve $53,352.56 for the Courthouse Project. After consideration, the motion PREVAILED by the following vote:
- Moved
- Roscoe Call, seconded by Todd Dishner
- Aye
- Wade Blevins, Todd Dishner, Howard Burton, Roscoe Call, Regina Davidson
- Nay
- Ron Blevins
- Absent
- Rick Blevins