The Smyth County Board of Supervisors met on April 15, 2009, to address new and old business. The Board approved a motion to appropriate $70,976.83 for three Sheriff's Department vehicles from the police activity fund (744-010000-9003), allowing checks to be written between meetings. This motion passed with five ayes and no nays. Regarding the courthouse renovation, Jay Moore of Mosley Architects presented current plans. The Board voted to proceed with the overall concept for a courthouse expansion and a new administrative building. This plan includes renovating the existing courthouse, adding 23,155 square feet on the north side, and constructing a 33,000-square-foot administrative building for temporary court space, emergency communications, and constitutional officers. The project also involves demolishing the old jail and the school building at 203 N Church Street, constructing two parking lots, and negotiating with the Bank of Marion regarding its parking parcel. The Board authorized final design phases for architectural and engineering contracts, contingent on available financing.
- Appropriated $70,976.83 for three Sheriff's Department vehicles from the police activity fund.
- Approved proceeding with the courthouse expansion and new administrative building concept.
- Plan includes adding 23,155 square feet to the existing courthouse on the north side.
- Plan includes constructing a 33,000-square-foot administrative building for court and emergency services.
- Approved demolition of the old jail and the school building at 203 N Church Street.
- Approved construction of two parking lots, one on the 203 N Church Street parcel.
- Authorized negotiation with the Bank of Marion regarding its parking parcel on the NE corner.
- Authorized final design phases for architectural and engineering contracts when financing is available.
Motions
2 motions read from the minutes. The line in bold above each one is a short label written by software; the text under it is the minutes' own.
-
Appropriate $70,976.83 (for 3 Sheriff's Department vehicles), with the ability to write checks between Board…
Carried 5–0 · $70,977
Supervisor Dishner motioned to appropriate $70,976.83 (for 3 Sheriff's Department vehicles), with the ability to write checks between Board meetings. This is appropriated from the police activity fund (744-010000-9003). Supervisor Neitch seconded the motion
- Moved
- Todd Dishner, seconded by Darlene Neitch
- Absent
- Wade Blevins, Michael Roberts
-
Proceed forward with the overall concept of the courthouse expansion, and construction of a new…
Outcome not recorded
Supervisor Dishner moved to proceed forward with the overall concept of the courthouse expansion, and construction of a new administrative building. The multiple pieces involved include: renovation of the existing courthouse and the addition of approximately 23,155 square feet on the North side of the building; construction of a new administrative building of approximately 33,000 square feet to house temporary court space, emergency communications center, and constitutional officers; demolition of the old jail; demolition of the old school building at 203 N Church Street; construction of two…
- Moved
- Todd Dishner, seconded by Darlene Neitch